1. Gate & vehicle route
Share the venue pin, approved gate, vehicle height/weight restrictions, booking slots, permits and loading contact.
Check the route from the delivery vehicle to every equipment position.
Share the venue pin, approved gate, vehicle height/weight restrictions, booking slots, permits and loading contact.
Measure the narrowest doorway, lift door and lift interior. Confirm lift load limits, floor level, slopes, stairs and the full carrying distance.
Mark level equipment positions, emergency exits, cable routes, refill access and protected loading zones. Obtain venue approval before delivery.
Give setup access before the event and a collection window after use. Confirm security check-in, contractor rules, a contact person and any overnight restrictions.